Modern two-storey house features sleek architectural lines and an open floor plan with a seamless blend of contemporary design and comfort
Easy indoor-outdoor flow with spacious living and family room. 4-bed, 2-bath, office and good size multi-purpose room
NZ Mid-Century Modernist Style. 3-bed, 2-bath open plan living with a sarking ceiling and exposed rafters and a large wrap-around deck
The four-bed, four-bathroom home with office & media room embracing indoor-outdoor flow with wrap-around decks
Current Stage:
Profiling
Current Stage:
House is wrapped
Ground floor framing nearly completed
Steel frames being lifted into place
Boxing removed, ready for frames
Slab pour
Foundation
Profiling
Excavation has started
Current Stage:
Finished!
Kitchen coming together
Gib stopped ready for painting
Exterior painting has started
Insulation & interior linings
Cladding completed
Joinery being installed
Rondos installed
Fascia painted
Soffit installed
House wrapped
Roofing going on
Trusses completed
House being wrapped
Ready for roof
Framing done
Trusses are ready to go on
Framing up
Glulam posts going in
Stunning Day!!
Pods laid ready for concrete
Concrete being poured
Boxed, preparing for rib-raft foundation
Excavation
Current Stage:
Kitchen installed
Laminate Planking being installed
Kitchen and bathroom taking place
Tiles installed
Exterior painting completed!
Ready for interior painting
Architraves & Skirtings
Decking completed
Gib stopping has started
Decking started
Cladding Complete. Rondos & Electrical Pre-wire
Cladding almost complete
Cladding & joinery
Cavity battens on ready for cladding
Interior frames up
Starting to wrap
House wrapped
Scaffold up!
Trusses on
Frames up!
Foundation completed
Starting the sub floor
Earthworks
Current Stage:
Tiles being installed
Interior painting completed
Decks
Gib stopping completed
Ready for interior painting
Interior linings have started
Installation installed
Rondos installed ready for prewire
Joinery in
Cladding started
House wrapped
Fascia installed
Progressing well!
Frames and scaffold up
Time to put frames up!
Expol & Strandfloor being installed
Subfloor underway
Current Stage:
Handover done!
Completed, ready for Client to move in!
Kitchen finished
Flooring complete
Lights up
Trims installed
Painting started
Decking completed
Hardiegroove ceiling with dummy rafters
Decking nearly finished
Exterior painting completed
Gib stopping underway
Decking commenced
Exterior painting
Interior walls gibbed
T & G Ceiling being installed
Insulation being installed
Exterior Cladding
Current Stage:
Fireplace complete
Kitchen being installed
Undercoat done
Ready for interior painting and tiling
Interior trims installed ready for painting
Interior trims installed ready for painting
Stopper done
Onto trims, architraves & doors
Gib stopping
Insulation complete, interior linings started
House is coming together nicely!
Rondo’s installed
Deck completed
Decking commenced
Insulation has started
Deck Framing has started
Exterior cladding completed
Rondos installed
Deck piles installed
Bricks being installed
Scaffolding being removed
Rondos installed
Framing complete
House is wrapped
Weatherboard being installed
Alfresco area taking shape
Delivery of bricks
Roof on
Exterior wrapped
Framing