Modern two-storey house features sleek architectural lines and an open floor plan with a seamless blend of contemporary design and comfort
A stunning two-story architectural build nestled amongst native bush, offering breathtaking sea views
The four-bed, four-bathroom home with office & media room embracing indoor-outdoor flow with wrap-around decks
Current Stage:
Exterior painting has started!
Cladding nearly completed
House is wrapped
Ground floor framing nearly completed
Steel frames being lifted into place
Boxing removed, ready for frames
Slab pour
Foundation
Profiling
Excavation has started
Current Stage:
Steel in place and framing has started!
Start of foundations
Excavation & profiling complete
Profiling
Current Stage:
Earthworks
Clearing the section
Current Stage:
Handover!
Trenching for drainage
Kitchen installed
Laminate Planking being installed
Kitchen and bathroom taking place
Tiles installed
Exterior painting completed!
Ready for interior painting
Architraves & Skirtings
Decking completed
Gib stopping has started
Decking started
Cladding Complete. Rondos & Electrical Pre-wire
Cladding almost complete
Cladding & joinery
Cavity battens on ready for cladding
Interior frames up
Starting to wrap
House wrapped
Scaffold up!
Trusses on
Frames up!
Foundation completed
Starting the sub floor
Earthworks
Current Stage:
Ready for handover!
Tiles being installed
Interior painting completed
Decks
Gib stopping completed
Ready for interior painting
Interior linings have started
Installation installed
Rondos installed ready for prewire
Joinery in
Cladding started
House wrapped
Fascia installed
Progressing well!
Frames and scaffold up
Time to put frames up!
Expol & Strandfloor being installed
Subfloor underway
Current Stage:
Landscaping
Footpaths done!
Alfresco area nearly complete
Tiles looking good!
Fireplace complete
Kitchen being installed
Undercoat done
Ready for interior painting and tiling
Interior trims installed ready for painting
Interior trims installed ready for painting
Stopper done
Onto trims, architraves & doors
Gib stopping
Insulation complete, interior linings started
House is coming together nicely!
Rondo’s installed
Deck completed
Decking commenced
Insulation has started
Deck Framing has started
Exterior cladding completed
Rondos installed
Deck piles installed
Bricks being installed
Scaffolding being removed
Rondos installed
Framing complete
House is wrapped
Weatherboard being installed
Alfresco area taking shape
Delivery of bricks
Roof on
Exterior wrapped
Framing